Driveway |
Not Paved, Not Paved, Not Paved, Not Paved, Not Paved |
Heating system |
Electric baseboard units, Electric baseboard units, Electric baseboard units, Electric baseboard units, Electric baseboard units |
Water supply |
Artesian well, Artesian well, Artesian well, Artesian well, Artesian well |
Heating energy |
Electricity, Electricity, Electricity, Electricity, Electricity |
Foundation |
Poured concrete, Poured concrete, Poured concrete, Poured concrete, Poured concrete |
Hearth stove |
Gaz fireplace, Gaz fireplace, Gaz fireplace, Gaz fireplace, Gaz fireplace |
Distinctive features |
Wooded lot: hardwood trees, Resort/Cottage, Wooded lot: hardwood trees, Resort/Cottage, Wooded lot: hardwood trees, Resort/Cottage, Wooded lot: hardwood trees, Resort/Cottage, Wooded lot: hardwood trees, Resort/Cottage |
Bathroom / Washroom |
Seperate shower, Seperate shower, Seperate shower, Seperate shower, Seperate shower |
Basement |
6 feet and over, Finished basement, 6 feet and over, Finished basement, 6 feet and over, Finished basement, 6 feet and over, Finished basement, 6 feet and over, Finished basement |
Parking |
Outdoor, Outdoor, Outdoor, Outdoor, Outdoor |
Sewage system |
Purification field, Septic tank, Purification field, Septic tank, Purification field, Septic tank, Purification field, Septic tank, Purification field, Septic tank |
Zoning |
Residential, Recreational and tourism, Residential, Recreational and tourism, Residential, Recreational and tourism, Residential, Recreational and tourism, Residential, Recreational and tourism |
Restrictions/Permissions |
Short-term rentals allowed, Short-term rentals allowed, Short-term rentals allowed, Short-term rentals allowed, Short-term rentals allowed |
Equipment available |
Level 2 charging station, Level 2 charging station, Level 2 charging station, Level 2 charging station, Level 2 charging station |